Reference sourcing specification · Cat Products

Modular Cat Tree — OEM Sourcing & Packing Spec

Flat-pack structural stability, CARB P2 wood panel spec, high-torque sisal column winding, and 5-ply mail-order box engineering.

Cat sourcing program
Core board 15–18 mm CARB P2 Low-formaldehyde density
Scratch column 6 mm natural sisal Tight spiral glue + staples
Hardware kit M8 / M10 steel bolts Blister-packed + spare cap
Mailer carton 5-ply BC flute EPE corner & end protection
Engineering & sourcing scope

What needs to be defined.

This engineering specification outlines the material, packaging, and QC parameters clarified before supplier allocation. Final specifications and commercial terms are confirmed against each buyer's written brief.

Tall cat trees ship flat-packed directly to end consumers, making transit carton damage and post-wobble complaints the biggest margin drains. Specifying heavy 15–18 mm E1 or CARB P2 particleboard base plates alongside oversized M10 dual-thread steel dowels creates a rigid center of gravity capable of supporting jumping adult cats.

Column durability hinges on paper-tube wall thickness (>= 4–5 mm kraft core), ABS end-cap insert depth, and tight spiral tension during 6 mm natural sisal rope winding. If glue coverage gaps appear during cold-weather glue curing, rope coils unravel within weeks.

Pre-shipment verification simulates home assembly directly from randomly selected boxed units using the included hex wrench and multilingual manual—confirming zero missing washers, pre-tapped wood insert nut alignment, and corner foam protection meeting drop-test standards.

01

Engineered board & base load:

Define base board footprint, 15–18 mm board density, and anti-tip wall strap anchors for multi-tier towers exceeding 120 cm height.

02

Sisal rope & plush spec:

Mandate unbleached 6 mm jute/sisal rope wound tightly with hot-melt adhesive anchoring, paired with short-pile 400 GSM plush upholstery.

03

Hardware tolerance & test build:

Conduct full trial assembly of sampled master boxes using only enclosed tools to verify pre-threaded T-nut alignment and vertical column plumb.

04

Mail-order drop packaging:

Line all six faces of 5-ply BC-flute mailers with honeycomb/EPE foam boards and labeled numbered part bags matching step-by-step diagrams.

05

Moisture & drop validation:

Verify board moisture content (<= 11%), hardware pack completeness by digital scale weight check, and carton drop tests prior to loading.

Sample carton & cube plan

Flat-pack mail-order carton calculation (modular cat trees).

High-density export carton layout maximizing 40HQ weight/cube balance.

SKU configuration (flat-pack)Carton L × W × H (m)CBM / ctnCartonsTotal QtyTotal CBMGross Weight
115 cm Compact 3-Tier Cat Tree (1 set/ctn)0.60 × 0.52 × 0.340.1061150 ctns150 sets15.91 CBM2,475 kg
148 cm Heavy-Base Condo Tower (1 set/ctn)0.64 × 0.56 × 0.400.1434120 ctns120 sets17.20 CBM2,640 kg
Combined Modular RangeMail-order ready—270 ctns270 sets33.11 CBM5,115 kg

Each hardware kit undergoes electronic scale weight verification to eliminate missing bolts before carton strapping.

Technical verification

Cat furniture engineering & assembly checks.

Written tolerances and inspection gates confirmed prior to bulk material purchase and mass production.

Structural & fastener check
Random sample trial build on every inspection batch; zero cross-threaded T-nuts, vertical post lean <= 1.5 degrees
Post winding & fabric bond
Zero gap between sisal coils when bent manually; staple heads recessed completely beneath rope fibers
Emission & board compliance
Verify E1 / CARB P2 formaldehyde test documentation on raw particleboard sheets allocated to the production order
Suggested control plan

From approval to shipment.

The exact checkpoints, inspection method, testing scope, and shipment plan should be written into the project brief before the order is placed.

01

Sample approval

Materials, construction, sizing, and branding confirmed before mass production.

02

Production control

In-line checkpoints aligned to the approved sample and agreed risk points.

03

Final inspection

Finished goods and packaging checked against the documented requirement.

04

Consolidation & shipment

Export packing, documents, and delivery coordinated as the project requires.

Plan your sourcing project.

Send the brief and we will map sampling, production, inspection, and shipment.

Start your project

Request a Quote

Share your product, quantity, files and destination. Our team is online 24/7 and replies within 2 hours.